Lagerhalle 1975 Werk 1

ON SITE with tradition

Centrally located in Germany

Since the company was founded in 1962, our headquarters in Bad Berleburg, Germany, has been continually expanded to make the most of the space available. This is complemented by our manufacturing facilities in Korbussen (Thuringia) and Bristol (UK). These strategic locations enable us to serve our customers throughout Europe at short distances, and with easy access to central transhipment centres, we can export worldwide.

Our headquarters: Bad Berleburg

With 4 plants including the newly built, fully automated BIKAR ZONE, our centrally located headquarters in Germany offers the optimal production environment for the high demands of our customers.

With 110,000 m2 of storage capacity, we always keep a large stock of non-ferrous metals in order to always be able to deliver, even in challenging times.

The blanks for our customers are produced on >25 sawing machines in 3-shift operation.

Adress: Industriestrasse 3-17
              57319 Bad Berleburg


Our 2nd production site: Korbussen

With the opening of our 2nd production site in Korbussen, Thuringia, in 2009, we took an important step towards expanding our business fields. With its central location and optimal transport links, the site is the perfect complement to our headquarters.

There are also 4 plants here, which process customer orders in 3-shift operation.

We make full use of our 90,000 tonnes of storage capacity to ensure that the best purchasing conditions are available and passed on to our customers.

In Korbussen, more than 25 different sawing systems ensure that your orders are processed smoothly.

Adress: Bikarstrasse 1
              07554 Korbußen


Our 3rd production site: Bristol

In May 2023, our 3rd production site has been opened in Bristol, UK.

Address: Unit 8b
               Patchway Trading
               Estate Britannia Road
               Patchway
               Bristol BS34 5TA